GMF EXPANSION PHASE II
Location: Glenwood Springs, CO
Roaring Fork Transportation Authority selected GOLDEN CONSTRUCTORS in a hard-bid delivery method to build Phase 2 of their Glenwood Springs Maintenance Facility. Phase 2, included grading, excavation, fleet maintenance building renovation and expansion. The expansion called for a 6,775 square-foot addition to the existing maintenance facility. Two additional maintenance bays were also added to the existing building.
Golden Constructors also administered renovations to the existing 11,098 square-foot building. The shared space between Dispatch Operations and IT was remodeled during the GMF Phase 2 Expansion Project and converted into a larger centralized dispatch center, a larger break room as well as a server room for the IT department’s equipment. A second level mezzanine was constructed to house additional offices, a conference room, break room, lockers and restrooms for maintenance personnel.